Skip to product information
Genuine Leather Office Desk Chair, Ergonomic Leather Executive Office Chair, Upgraded Wood Grain Finish and S Curve Back with Solid Aluminum Frame, Luxury and Mordern
$1,367.49
Sale price
$1,367.49
Regular price
Color: Black & Wood
Features:
- 【Genuine Leather Office Chair Comfort】 Wrapped in high-grade genuine leather that is soft, durable, and ages beautifully. Naturally breathable surface keeps you cool and comfortable throughout the workday. The high-back design offers focused support without restricting movement.
- 【Mid-Century Modern Office Chair Aesthetic】 Where textures meet quietly — warm wood-grain meets rich top-grain leather. True to mid-century modern style, this chair lets natural materials speak without shouting. The subtle wood insert on the backrest adds organic warmth, balancing clean aluminum and genuine leather for a look that's understated, balanced, and timeless.
- 【Ergonomic Leather Office Chair High Back】 Precisely engineered spine-supporting curve gently cradles your mid-to-upper back, promoting healthy posture during long hours of sitting — ideal for home offices, reading nooks, or executive suites. Features a 130° recline function and 360° smooth swivel, allowing you to lean back comfortably during breaks and rotate effortlessly around your workspace.
- 【High End Office Chair Construction with 350 lbs Capacity】 Built with a sleek aluminum skeleton for exceptional strength and rust resistance — supports up to 350 lbs (158 kg) with confidence. High-back profile fits seamlessly into studies, living rooms, or offices while maintaining an open, uncluttered look.
- 【High Quality Office Chair with Compact Dimensions】 Overall size: 25.98" D × 24.80" W × 30.70" H (66 cm × 63 cm × 78 cm). Seat height adjusts from 16.92" to 20.86" (43–53 cm). Fits seamlessly into studies, living rooms, or offices. Assembly required (tools included). Imported.
Package Dimensions: 45.0 x 32.0 x 30.0 inches